EPRI/SQURTS Program -
Test Video Clips
Resources
•
Download Annual Test Schedule
•
Qualified Parts Catalog - by Part Type
•
Qualified Parts Catalog - by Manufacturer
•
EPRI Database of SQURTS Summary Sheets
•
EPRI/SQURTS eRoom
To access the SQURTS online submittal form, please
Login
Select a Video
S1731: Xcel Shielding Support Rack; Aluminum Frame; Supports 6 6' Long Blankets, SSE
S1720: Duke Secure Gate Systems Lead Shielding Rack, OBE 15 (SQURTS Floor)
S1714: Dominion UPS, SSE 2
S1425: Exelon CBS Rackable Breaker Insert, SSE1
S1424: Xcel Modified Panel Board Assembly, SSE2
S1525: Duke Trane HVAC Unit, SSE1
S1508: First Energy Solenoid Valve Repair Kit, SSE2
S1509: Exelon Syscom Seismic Monitoring System, SSE2
S1321: Aug. 2013 � Energy Northwest, Table Limits, Loose Wire Operability Test
S1324: Sept. 2013 � Diablo Canyon, Site Specific SSE RRS, Magnet Mounted RF Frame Shield
S1303: Jan. 2013 � Heinemann Circuit Breakers in a panel, TVA Site Specific SSE
S1316: July 2013 � Table Limits Group Test, SQURTS SSE
S1319: Aug. 2013 � Table Limits Group Test, SQURTS SSE
S1320: Aug. 2013 � Floor SSE RRS, Dominion TPC Wire & Cable Enclosure for FLEX
MAR10: Table Limits Group Test; SQURTS; OBE 5
MAR10: Table Limits Group Test; SQURTS; SSE 1
OCT08: Rosemount Transmitter and Strainer; SNC/WCNOC; OBE 5
OCT08: Rosemount Transmitter and Strainer; SNC/WCNOC; SSE 1
OCT07: SNC Relay, Seismic Test
OCT07: SNC Relay, Impact Test
APR07: Lancs Industries Mobile Radiation Shield; Ten Blankets Installed; TVA; SQURTS Floor OBE horizontal, ½ OBE vertical
APR07: Lancs Industries Mobile Radiation Shield; Zero Blankets Installed; TVA; SQURTS Floor OBE horizontal, ½ OBE vertical
JAN07: Battery Jumper; PG&E; SSE - Table Limits
AUG06: C&D Batteries; Rack Mount; PG&E; Site Specific
AUG06: ARV Block Valve Remote Operator (Portersville Gear Operator); TXU; Vertical Sine Sweep, ~18-32 Hz
AUG06: ARV Block Valve Remote Operator (Portersville Gear Operator); TXU; Lateral Sine Beat, low freq.
AUG06: ARV Block Valve Remote Operator (Portersville Gear Operator); TXU; Axial Sine Beat, high freq.
AUG06: ARV Block Valve Remote Operator (Portersville Gear Operator); TXU; Vertical Sine Beat, 20 Hz
AUG06: ARV Block Valve Remote Operator (Trentec Reach Rod Assembly); TXU; Triaxial SSE, Table Limits
JUN06: Chemetron FM-200 Clean Agent Fire Alarm System; SRS; Site Specific
JAN06: Planar 23" LCD Monitor; Rigid Mount; Southern Company; Site Specific
JAN06: Big Beam Emergency Lights; Pedestal Mount; Southern Company; Site Specific
JUL05: ViewSonic 23" LCD Monitor; Rigid Mount; Duke Energy; Narrowband, 7G, 8-12Hz
JUL05: IBM Keyboard & Mouse; Floor Mount; Duke Energy; Table Limits
JUN05: ViewSonic 23" LCD Monitor; Flexible Mount; Southern Company; Narrowband, 7G, 8-12Hz
MAR05: Lead Shielding Blanket; On Masonite Flooring; NMC; Broadband, 3G Horizontal, 1G Vertical
MAR05: Lead Shielding Blanket; On Masonite Flooring with Securing Rope; NMC; Broadband, 3G Horizontal, 1G Vertical
MAR05: Lead Shielding Blanket; On Aluminum Shake Table Top; NMC; Broadband, 3G Horizontal, 1G Vertical
MAR05: Appleton Baymaster 1000 High Bay Light Fixture; Hanging Mount; Southern Company; Site Specific SSE; Test 2
MAR05: Appleton Baymaster 1000 High Bay Light Fixture; Hanging Mount; Southern Company; Site Specific SSE; Test 4
OCT04: Big Beam Light; Southern Company
SEP04: NEC/Mitsubishi LCD Monitor; Vertical Wall Mount; FirstEnergy
SEP04: NEC/Mitsubishi LCD Monitor; Articulating Arm Mount (Innovative Office Products); FirstEnergy
JUL04: Big Beam Light; Southern Company
APR04: Generic; Table Limits Test; SSE2
MAR04: Generic; Table Limits Test; SSE Level
MAR04: Flexible Mount; PG&E; Site Specific SSE Level
JAN04: Generic; Table Limits Test; SSE1
JAN04: Generic; Table Limits Test; SSE2
DEC03: Syscom Instruments 19" Seismic Monitoring Cabinet; Tested with Door Open; PG&E; Site Specific
DEC03: Syscom Instruments 19" Seismic Monitoring Cabinet; Door Opened, Back Panel fell off during test; PG&E; SQURTS Floor Response
JUN03: Cart, 36" x 24" x 34", 80lb. load, 35psi tire pressure; PG&E; Site Specific; Test 1
JUN03: Cart, 36" x 24" x 34", no load, 5psi tire pressure; PG&E; Site Specific; Test 6
JUN03: Cart, 30" x 16" x 32", 20lb. top shelf load, 40lb. bottom shelf load, hard plastic casters; PG&E; Site Specific; Test 9
APR03: Net Floor Flooring System; Southern Company
MAR03: Hydrogen Monitor Assembly; Pedestal Mount; SRS
FEB02: Annual RIM Test; High Frequency; Horizontal
FEB02: Annual RIM Test; High Frequency; Vertical
FEB02: Annual RIM Test; Low Frequency; Horizontal
FEB02: Annual RIM Test; Low Frequency; Vertical
NOV01: 18" LCD Monitor; Radial Arm Mount; Amergen
MAR01: Crispin Valve; Pedestal Mount; SRS; SQURTS Floor Response
FEB99; 12' Scaffolding; CP&L
Your browser does not support the video tag.